Tests a candidate’s knowledge of the construction, service, and repair of residential swimming pools. Does not include direct connections to a sanitary sewer system nor to potable water lines, nor the grounding and bonding of metal surfaces, nor the making of any electrical connections.
Number of Questions 51
Time allowed (hours) 3
Subject Area # Quest.
Plan Reading & Estimating 5
Site Preparation, Excavation and Backfilling 6
Pool Shell Construction 14
Interior Surface Preparation and Finishing 6
Tile, Coping and Trimwork 5
Accessory Work 5
Care and Operation 6
Safety 4
References
Basic Safety
Builder’s Guide to Swimming Pool Construction, 2005.
Florida Building Code 2017 – Residential, 2017
Reviews
There are no reviews yet.